Legislation Details

File #: 22-1930    Version: 1
Type: Agreement Status: Agenda Ready
File created: 10/10/2022 In control: Board of Supervisors
On agenda: 11/8/2022 Final action: 11/8/2022
Title: Director of Public Works requests the following: 1. Approval of and authorization for the Chair to sign Amendment No. 1 to Agreement No. 220210B with YEI Engineers, Inc. increasing maximum compensation by $109,981 for a new maximum of $300,544 for additional engineering design and support services for the 1127 First Street HVAC Replacement Project, PW 21-23; and 2. Approval of a Budget Transfer for the following (4/5 votes required): a. Increase appropriations by $109,981 in the Accumulated Capital Outlay Fund (ACO) (Fund 3000, Org 3000000) with the use of its available fund balance to be transferred to Project 21070; and b. Increase appropriations by $109,981 in 1127 First Street HVAC Replacement Project budget (Fund 3000, Org 3000550, Project 21070) offset by a transfer-in revenue from the ACO.
Sponsors: Board of Supervisors
Attachments: 1. Agreement, 2. PowerPoint Presentation (added after meeting), 3. 22-1930 Board Letter
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO: Board of Supervisors
FROM: Steven Lederer - Director of Public Works
REPORT BY: Daniel Basore - Engineering Supervisor
SUBJECT: Amendment to Professional Services Agreement No. 220210B with YEI Engineers, Inc. in Support of 1127 First Street HVAC Replacement Project, PW 21-23


RECOMMENDATION
title
Director of Public Works requests the following:
1. Approval of and authorization for the Chair to sign Amendment No. 1 to Agreement No. 220210B with YEI Engineers, Inc. increasing maximum compensation by $109,981 for a new maximum of $300,544 for additional engineering design and support services for the 1127 First Street HVAC Replacement Project, PW 21-23; and
2. Approval of a Budget Transfer for the following (4/5 votes required):
a. Increase appropriations by $109,981 in the Accumulated Capital Outlay Fund (ACO) (Fund 3000, Org 3000000) with the use of its available fund balance to be transferred to Project 21070; and
b. Increase appropriations by $109,981 in 1127 First Street HVAC Replacement Project budget (Fund 3000, Org 3000550, Project 21070) offset by a transfer-in revenue from the ACO.
body

EXECUTIVE SUMMARY
On December 14, 2021, the Board of Supervisors (Board) approved a professional service agreement with YEI Engineers, Inc. to develop a design for replacing the heating, ventilation, and air conditioning (HVAC) units on 1127 First Street building. In addition to evaluation of the HVAC units, YEI also observed issues with the existing roofing of the building jeopardizing the feasibility of implanting the HVAC project. Public Works staff utilized an on-call architectural firm to evaluate the roof which confirmed the observed issues raised by YEI. The proposed amendment expands YEI's contract to design a roofing system compatible with the HVAC project and verifies that the existing buildings roof's structural capacity is sufficient for the two improvements.

PROCEDURAL REQUIREMENTS:
1. Staff reports.
2. Public comments.
3. Motion, second, discussio...