TO: Board of Supervisors
FROM: Steven Lederer, Director of Public Works
REPORT BY: Sonja El-Wakil, Associate Engineer
SUBJECT: Approval of Plans and Specifications, and Authorization to Advertise the "Measure U Solano Avenue Pavement Repair Project," RDS 25-01
RECOMMENDATION
title
Approval of plans and specifications for the "Measure U Solano Avenue Pavement Repair Project," RDS 25-01 and authorization to advertise for sealed bids and opening of the bids at a time, date, and location to be published by the Director of Public Works pursuant to Public Contract Code section 20150.8. (No Fiscal Impact)
body
BACKGROUND
The Solano Avenue roadway repairs were identified through the County's procedure to do roadway maintenance based on Pavement Condition Index (PCI), an overall measure of the condition of the road surface developed by the United Sates Army Corps of Engineers and later standardized by American Society for Testing and Materials (ASTM). The PCI shows a numerical index ranging from 0 to 100, with 100 being a best roadway condition that is anticipated to support 20 years of use.
Solano Avenue from Locust Avenue (City of Napa limit) to Vineyard View Drive (Town of Yountville limit) (3.2 miles) (PCI varies, as low as 19) will install new hot mix asphalt surfacing over a full-depth reclamation treatment. The work is scheduled to occur on Solano Avenue, from the City of Napa Limit (Locust Ave) to the Town of Yountville limit (Vineyard View Dr). The roadway is now in varying condition, including "failed" with 81% of the recorded PCIs between 14 and 27. Solano Avenue has extensive amounts of distress affecting the speed and flow of traffic. The Project will result in safer travel ways for the public and increased road durability to meet the continually increased traffic demand of the road. The Project will improve the PCI to 100, with a renewed life span of 20 years.
Additionally, the City of Napa is working in cooperation with Napa County developing a cost sha...