TO: Board of Supervisors
FROM: Steven Lederer, Director of Public Works
REPORT BY: Dewey Phan, Assistant Engineer
SUBJECT: Construction Contract Award for the "Redwood Road MPM 5.41 Project," RDS 26-22
RECOMMENDATION
title
Award a Construction Contract to North Bay Excavation, Inc., of Valley Ford, CA in the amount of $158,325 for the "Redwood Road MPM 5.41 Project," RDS 26-22. (Fiscal Impact: $234,906 Expense for the construction contract and other project costs; General Fund, Reallocation of Budget; Discretionary)
body
BACKGROUND
The November 2025 storms caused a small landslide that undermined about 33 linear feet of the roadway edge, leaving part of the asphalt concrete road unsupported and creating a steep drop down to a private driveway. To ensure the future stability of the road and provide public safety, staff propose to repair the damage by installing a new rock slope protection (RSP) buttress to stabilize the downhill shoulder of 4620 Redwood Road at a 1:1 slope, about ten feet high, averaging five feet in thickness. Following installation of the RSP, about 100 feet of the damaged road surface will be reconstructed or repaved.
The Board authorized advertising for the project on June 16, 2026, and the Public Works staff opened bids on July 21, 2026, with the results listed below:
North Bay Excavation, Inc. Valley Ford, CA $158,325
Maggiora & Ghilotti San Rafael, CA $195,195
Rege Construction Cloverdale, CA $218,239
Rehak Construction LLC Auberry, CA $223,731
Peters Excavating, Inc. Sebastopol, CA $229,974
Gaub Trucking Corp San Ramon, CA $234,082
W.R. Forde Associates, Inc. Richmond, CA $244,515
Imperial Construction & Engineering, Inc. Roseville, CA $247,451
Gravity Construction ...