Skip to main content
Napa County Logo
File #: 25-1945    Version: 1
Type: Public Hearing Status: Agenda Ready
File created: 11/18/2025 In control: Planning Commission
On agenda: 12/3/2025 Final action:
Title: E&P TECHNOLOGY WAY - BUILDINGS A & B / DENNIS PAULLEY / USE PERMIT APPLICATIONS #P22-00307 and #P22-00308 CEQA Status: Consideration and possible adoption of a Mitigated Negative Declaration. According to the proposed Mitigated Negative Declaration, the proposed project would not have any potentially significant environmental impacts after implementation of mitigation measures. Mitigation measures are proposed for the following areas: Biological Resources, Cultural Resources, and Transportation. The project site is not included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5. (State Clearinghouse Number #2024100855) 2024100855) Request: Approval of two separate Use Permit applications to allow the construction of two separate projects and buildings: Building A - a 450,000 gallon per year wine production and storage facility within a proposed 143,312 sf building (P22-00307-UP) and Building B - speculative warehouse/office uses within a propo...
Sponsors: Board of Supervisors
Attachments: 1. A. Revised Recommended Findings, 2. B. Revised Conditions of Approval & Final Agency Approval Memos - Building A, 3. C. Revised Conditions of Approval & Final Agency Approval Memos - Building B, 4. D. Revised Initial Study/Mitigated Negative Declaration & MMRP, 5. E. Use Permit Application Packets, 6. F. Biological Resource Analysis, 7. G. Transportation Impact Study, 8. H. Water Supply Reports, 9. I. Geotechnical Investigation, 10. J. Stormwater Control Plans, 11. K. Graphics, 12. L. NVBPSP Wineries, 13. M. California Department of Fish & Wildlife letter dated November 15, 2024, 14. N. Adams Broadwell Joseph & Cardoza letter dated November 19, 2024, 15. O. Water Audit California letter dated November 19, 2024, 16. P. Other Public Comments, 17. Q. First Carbon Solutions response to comments memo dated November 10, 2025, 18. R. Staff Memo dated November 20, 2025
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO: Napa County Planning Commission
FROM: Brian D. Bordona, Director of Planning, Building and Environmental Services
REPORT BY: Sean Kennings, Contract Planner
SUBJECT: E & P Technology Way - Buildings A & B


RECOMMENDATION
title
E&P TECHNOLOGY WAY - BUILDINGS A & B / DENNIS PAULLEY / USE PERMIT APPLICATIONS #P22-00307 and #P22-00308

CEQA Status: Consideration and possible adoption of a Mitigated Negative Declaration. According to the proposed Mitigated Negative Declaration, the proposed project would not have any potentially significant environmental impacts after implementation of mitigation measures. Mitigation measures are proposed for the following areas: Biological Resources, Cultural Resources, and Transportation. The project site is not included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5. (State Clearinghouse Number #2024100855) 2024100855)

Request: Approval of two separate Use Permit applications to allow the construction of two separate projects and buildings: Building A - a 450,000 gallon per year wine production and storage facility within a proposed 143,312 sf building (P22-00307-UP) and Building B - speculative warehouse/office uses within a proposed 66,915 sf building (P22-00308-UP).

The Building A project proposes winery uses that will include grape crushing, bulk wine processing and storage, stainless steel tank and barrel storage, bottling, and office space. In addition, approximately 13,000 sf of covered outdoor work area will be located on the north side of the building. The proposal also includes 129 parking spaces and eight (8) spaces for semi-trailers. Access will be provided by three (3) new driveways; one (1) on Technology and two (2) on Morris Court. Tours, tastings, and marketing events are not proposed with this application and will not occur as part of this permit. The applicant is also requesting a variation to the development regulations of the Specific Plan to reduce the require...

Click here for full text