File #: 25-864    Version: 1
Type: Agreement Status: Agenda Ready
File created: 5/7/2025 In control: Board of Supervisors
On agenda: 6/17/2025 Final action:
Title: Approve and authorize Amendment No. 1 to Agreement No. 230262B with Christopher A. Marusich and Michelle F. Del Rosario, Trustees of the Marusich Family Revocable Trust Dated May 4, 2017, to increase the maximum compensation by $18,282 for a new maximum of $177,282 to extend the duration of the temporary construction easement for the Dry Creek Road Bridge over Dry Creek Replacement Project and accept the extended temporary construction easement. (Fiscal Impact: $18,282 Expense; Roads Fund; Budgeted; Discretionary)
Sponsors: Board of Supervisors
Attachments: 1. Agreement, 2. Temporary Construction Easement Deed, 3. Budget Summary
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO: Board of Supervisors
FROM: Steven Lederer, Director of Public Works
REPORT BY: Graham Wadsworth, P.E., Engineering Supervisor
SUBJECT: Approval of Amendment 1 to Purchase and Sale Agreement No. 230262B in support of the Construction of the Dry Creek Road Bridge over Dry Creek Replacement Project, RDS 15-22 and Acceptance of Extended Temporary Construction Easement Deed

RECOMMENDATION
title
Approve and authorize Amendment No. 1 to Agreement No. 230262B with Christopher A. Marusich and Michelle F. Del Rosario, Trustees of the Marusich Family Revocable Trust Dated May 4, 2017, to increase the maximum compensation by $18,282 for a new maximum of $177,282 to extend the duration of the temporary construction easement for the Dry Creek Road Bridge over Dry Creek Replacement Project and accept the extended temporary construction easement. (Fiscal Impact: $18,282 Expense; Roads Fund; Budgeted; Discretionary)
body
BACKGROUND
The Dry Creek Road Bridge over Dry Creek (0.8 miles west of Mt. Veeder Rd.) is over 100 years old. Caltrans identified the bridge as structurally deficient, functionally obsolete, and unstable due to scour under the north abutment. The substructure of the existing bridge has cracking and weathering of the mortar in the joints of the stone masonry abutments. The top section of the retaining wall near the north abutment has broken away and is leaning outward horizontally. The width is only 18 feet between the barriers, which does not meet the American Association of State Highway and Transportation Officials (AASHTO) standard of 11-foot minimum lanes. AASHTO is a standards setting body which publishes specifications, test protocols, and guidelines that are used in highway design.
The proposed bridge structure would consist of an approximately 80-foot-long by 32-foot-wide single- span concrete slab bridge that would be constructed on pre-cast and pre-stressed concrete girders. The project also includes 900 feet of new roadway to remove two curves ...