File #: 25-1140    Version: 1
Type: Agreement Status: Agenda Ready
File created: 6/9/2025 In control: Board of Supervisors
On agenda: 6/24/2025 Final action:
Title: Award of Construction Contract to Team Ghilotti, Inc., of Petaluma, CA in the amount of $4,397,141 for the "Bale, Big Ranch, Lodi, Silverado Trail, and West Zinfandel Paving Project," RDS 25-06; and approve a Budget Amendment. (Fiscal Impact $5,996,147 Expense; Measure T Special Revenue; Not Budgeted; Discretionary) [4/5 vote required]
Sponsors: Board of Supervisors
Attachments: 1. List of Bids, 2. Budget Summary
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

TO:                     Board of Supervisors

FROM:                     Steven Lederer, Director of Public Works

REPORT BY:                     Daniel Basore, Engineering Supervisor

SUBJECT:                     Construction Contract Award and Budget Amendment for the “Bale, Big Ranch, Lodi, Silverado Trail, and West Zinfandel Paving Project,” RDS 25-06

RECOMMENDATION

title

Award of Construction Contract to Team Ghilotti, Inc., of Petaluma, CA in the amount of $4,397,141 for the “Bale, Big Ranch, Lodi, Silverado Trail, and West Zinfandel Paving Project,” RDS 25-06; and approve a Budget Amendment. (Fiscal Impact $5,996,147 Expense; Measure T Special Revenue; Not Budgeted; Discretionary)
[4/5 vote required]

body

BACKGROUND

On April 22, 2025, the Board of Supervisors (BOS) authorized creation of the “Bale, Big Ranch, Lodi, Silverado Trail, and West Zinfandel Paving Project,” RDS 25-06 and a budget amendment of $50,000 to fund the design of the project.

The roads to be included in the project are as follows:

Bale Lane (0.70 miles) - All

Big Ranch Road (0.7 miles) - Oak Knoll Ave (east) to End

Lodi Lane (0.53 miles) - All

Silverado Trail (2.4 miles) - Zinfandel Lane to 6,000 feet south of the Caltrans SR 128

West Zinfandel Lane (0.56 miles) - All

Total miles: 4.9 miles

On May 6, 2025, the Board of Supervisors approved the plans and specifications and authorized to advertise for sealed bids and opening of the bids pursuant to Section 20150.8 of the Public Contract Code. On June 16, 2025, bids were received and opened. The bid results are attached for reference.

Staff recommends awarding the contract to the lowest responsive bidder, Team Ghilotti, Inc., of Petaluma, CA, for their base bid of $4,397,141. Team Ghilotti’s base bid is lower than the engineer’s estimate of $5,300,000. The total project cost, including design and engineering, construction, construction management, geotechnical services and contingency, is $6,046,147. The project will be funded by Measure-T.

Team Ghilotti, Inc. is not a local vendor however, the Public Contract Code requires that the construction contract be awarded to the lowest responsible and responsive bidder regardless of whether the low bidder is local or not. Staff reached out to the local construction contractor community by advertising the request for bids in the Napa Valley Register and the Solano-Napa Builder’s Exchange, and by posting on the County website. Staff also sent “Notices to Contractors” to the local construction community.

Requested Actions:

1.                     Award of the Construction Contract for the “Bale, Big Ranch, Lodi, Silverado Trail, and West Zinfandel Paving Project,” RDS 25-06 to Team Ghilotti, Inc., of Petaluma, California for their low base bid of $4,397,141 and authorization for the Chair to sign the construction contract;

2.                     Approve a Budget Amendment for the following (4/5 votes required):

a.                     Increase Transfers Out appropriations by $5,996,147 in the Measure T Non-Operating Special Revenue Fund (Fund 2440, Sub-Division 1220053, Account 56100) (M-T SRF) offset by use of its available fund balance to transfer to project 25042; and

b.                     Increase Construction Services appropriations by $5,996,147 (Fund 2040, Sub-Division 2040500, Project 25042, Account 52360) offset by a transfer-in revenue from M-T SRF.

FISCAL & STRATEGIC PLAN IMPACT

Is there a Fiscal Impact?

Yes

Is it currently budgeted?

No

Is it Mandatory or Discretionary?

Discretionary

Discretionary Justification:

Approval of the Budget Amendment is necessary to award contract and move the project forward toward construction.

Is the general fund affected?

Yes

Future fiscal impact:

Construction will likely finish in FY 2025/26 with no future impacts beyond standard roadway maintenance.

Consequences if not approved:

The listed roads will not be rehabilitated.

 

ENVIRONMENTAL IMPACT

ENVIRONMENTAL DETERMINATION: It has been determined that this type of project does not have a significant effect on the environment and is exempt from the California Environmental Quality Act. [See Class 1 (“Existing Facilities”) which may be found in the guidelines for the implementation of the California Environmental Quality Act as 14 CCR §15301; see also Napa County’s Local Procedures for Implementing the California Environmental Quality Act, Appendix B.]