Legislation Details

File #: 26-1055    Version: 1
Type: Report Status: Agenda Ready
File created: 4/24/2026 In control: Board of Supervisors
On agenda: 5/19/2026 Final action:
Title: Award a Construction Contract to Argonaut Constructors, Inc., of Santa Rosa, California, in the amount of $1,488,614 for the "Upper Partrick Road Rehabilitation Project," RDS 24-37, including the base bid and Bid Alternate No. 1. (Fiscal Impact: $1,488,614; Roads Capital Improvement Project Fund; Budgeted; Discretionary)
Sponsors: Board of Supervisors
Attachments: 1. Budget Summary
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

TO:                     Board of Supervisors

FROM:                     Steven Lederer, Director of Public Works

REPORT BY:                     James Reese, Associate Engineer

SUBJECT:                     Award of Construction Contract for the “Upper Partrick Road Rehabilitation Project,” RDS 24-37

 

RECOMMENDATION

title

Award a Construction Contract to Argonaut Constructors, Inc., of Santa Rosa, California, in the amount of $1,488,614 for the “Upper Partrick Road Rehabilitation Project,” RDS 24-37, including the base bid and Bid Alternate No. 1. (Fiscal Impact: $1,488,614; Roads Capital Improvement Project Fund; Budgeted; Discretionary)

body

 

BACKGROUND

The Upper Partrick Road Rehabilitation Project will pave approximately 0.9 miles of Partrick Road beginning near address 1766 and extending west to the point where the road narrows to a single lane. Every year, the Director of Public Works selects roads for rehabilitation based on their Pavement Condition Index (PCI), which is a numerical index ranging from 0 to 100 that measures pavement condition from failed to new. The PCI for this segment of Partrick Road is approximately 22, indicating a roadway in poor condition requiring rehabilitation. This segment of roadway is severely deteriorated and is experiencing several slow-moving slides, deep pavement cracking, and areas of significant pavement distress.

The project will improve drivability and long-term roadway stability. The proposed work includes construction of limited stitch pile retaining walls at locations where roadway movement has been observed and where slope instability poses the greatest risk to the roadway. Pavement sections exhibiting the most severe distress will be leveled with new asphalt concrete, and the roadway will receive a full overlay to extend the life of the pavement. Three culverts will also be replaced. Two bid alternates were included in the bid set. Bid alternate #1 for additional stitch piles and bid alternate #2 to overlay a 1,200-foot section of road from 1766 to 1781 Partrick Road.

On March 24, 2026, the Board of Supervisors approved the plans and specifications and authorized Public Works to advertise for bids. The project was subsequently advertised on March 26, 2026.

On April 23, 2026, bids were received and publicly opened.

Bid Summary
Contractor
                                                                                    Bid Amount                                          Status
Maggiora & Ghilotti, Inc.
                                          $1,152,152.00                                          Non-Responsive
Argonaut Constructors, Inc.
                                          $1,227,493.50                                          Lowest Responsive Bidder
Granite Construction Company
                     $1,345,000.00                                          Responsive
Ghilotti Construction Company
                     $1,412,750.00                                          Responsive

Maggiora & Ghilotti, Inc. was determined non-responsive for failure to submit the required bid bond prior to bid opening. This is a material requirement and cannot be waived. Argonaut Constructors, Inc., is the lowest responsive and responsible bidder. Argonaut Constructors, Inc. had a bid alternate #1 cost of $261,120 for a total contract value of $1,488,613.50. Bid alternate #2 will not be awarded.

Requested Action:
Award a Construction Contract to Argonaut Constructors, Inc. in the amount of $1,488,613.50.

 

FISCAL IMPACT

Is there a Fiscal Impact?

Yes

Is it currently budgeted?

Yes

Where is it budgeted?

Fund 2040, Sub-division 2040500, Project 25015

Is it Mandatory or Discretionary?

Discretionary

Discretionary Justification:

Partrick Road is in need of repair.

Is the general fund affected?

No

Future fiscal impact:

Project should lessen maintenance requirements on Partrick Road

Consequences if not approved:

The roads will not be repaired, resulting in a potential roadway safety hazard.

Additional Information

Strategic Initiative: Build Healthy, Connected Communities.

 

ENVIRONMENTAL IMPACT

ENVIRONMENTAL DETERMINATION: Consideration and possible adoption of a Categorical Exemption Class 1: It has been determined that this type of project does not have a significant effect on the environment and is exempt from the California Environmental Quality Act. [See Class 1 (“Existing Facilities”) which may be found in the guidelines for the implementation of the California Environmental Quality Act at 14 CCR §15301; see also Napa County’s Local Procedures for Implementing the California Environmental Quality Act, Appendix B.]