TO: Board of Supervisors
FROM: Brian Bordona, Director of Planning, Building and Environmental Services
REPORT BY: Brian Bordona, Director of Planning, Building and Environmental Services
SUBJECT: Le Colline Vineyard Appeal

RECOMMENDATION
title
PUBLIC HEARING 9:00 AM - Le Colline
LE COLLINE VINEYARD EROSION CONTROL PLAN APPLICATION NO. P14-00410-ECPA
CEQA Status: Consideration and possible recertification of Final Environmental Impact Report (FEIR) prepared (December 2022) (State Clearinghouse No. 2016042030).
Request: Consideration and possible direction regarding an appeal filed by Center for Biological Diversity (Appellant or CBD) concerning the Le Colline Vineyard agricultural erosion control application (P14-00410-ECPA) submitted by Le Colline, LLC and Cold Springs, LLC (Applicant) to a decision made by the Designee of the Interim Director (Director) of the Planning, Building and Environmental Services (PBES) Department on March 24, 2023, to: (1) certify the Final EIR prepared for the Le Colline Vineyard project (P14-00410-ECPA); (2) adopt the findings required pursuant to the California Environmental Quality Act (CEQA) including, but not limited to, rejecting the Proposed Project, the No Project Alternative and the Reduced Intensity Alternative, finding the Increased Water Quality and Sensitive Habitat Protection Alternative as revised and as set forth in the FEIR (the Modified Project or the Water and Habitat Alternative) consistent with the Napa County General Plan; (3) adopt the Mitigation Monitoring and Reporting Program; (4) adopt the Water and Habitat Project Alternative; and (5) approve ECPA No. P14-00410-ECPA as revised to reflect the Modified Project, which generally consists of increased stream setbacks to avoid areas with relative higher biological value, and provide for greater wildlife movement. The Modified Project consists of approximately 20.55 acres of new vineyard development.
The project site is located on 88.3-acres south of the community of Angwin, on the east side of Howell Mountain Road and west of Cold Springs Road, within the unincorporated portion of Napa County (County). The site is zoned Agricultural Watershed (AW) and general plan designated Agriculture, Watershed and Open Space (AWOS) on Assessor’s Parcel Numbers (APNs) 024-300-070, 024-300-071, 024-300-072, and 024-340-001 (the Property). (CONTINUED FROM JUNE 6, 2023)
body
EXECUTIVE SUMMARY
Copies of the Applicant’s proposal, the appeal packet, the DEIR, FEIR, ECP No. P14-00410-ECPA and related documents are available for review on the Planning, Building and Environmental Services’ (PBES) Current Projects Explorer page at https://www.countyofnapa.org/2876/Current-Projects-Explorer or at the PBES Department located at 1195 Third Street, 2nd Floor, Napa, CA 94559.
The matter before the Board involves an appeal filed by CBD to a decision by the Director of the PBES Department on March 24, 2023 to certify a Final EIR, adopt CEQA findings and approve an agricultural erosion control plan (P14-00410-ECPA)(Attachment A) submitted by the Applicant to develop and operate approximately 20.55 net acres of new vineyard (also referred to as the Modified Project) within the Lake Hennessey Sensitive Domestic Water Supply Drainage. The project also involves a timberland harvest and conversion permit within the development area that will be acted on separately by the California Department of Forestry (CDF). The project site is located south of the community of Angwin, on the east side of Howell Mountain Road and west of Cold Springs Road.
PROCEDURAL REQUIREMENTS:
1. Chair introduces item and invites Staff Report presentation.
2. Chair opens the public hearing and invites testimony from Appellant and Appellant’s witnesses as previously disclosed on the witness list and in the order noted on the witness list attached as Attachment C.
3. Chair invites any other interested members of the public to testify regarding the Appeal.
4. Chair invites Applicant and Applicant’s witnesses as previously disclosed on the witness list and in the order noted on the witness list attached as Attachment C.
5. Chair then invites Appellant to have final rebuttal (time permitting).
6. Chair closes the public hearing and invites disclosures from Board members.
7. A motion of intent is made and seconded to deny, uphold, and/or remand the Appeal.
8. Chair refers the matter to County Counsel’s office for preparation of a Resolution of Findings and Decision on Appeal. Because of the current workload, good cause exists for County Counsel’s office to have up to ninety days to prepare the Resolution of Findings and Decision on Appeal. Consequently, Staff recommends that the Board direct County Counsel’s office to return to the Board on November 7, 2023 at 9:00 a.m. with the proposed Resolution for the Board’s consideration and adoption.
FISCAL & STRATEGIC PLAN IMPACT
|
Is there a Fiscal Impact? |
No |
|
County Strategic Plan pillar addressed: |
Vibrant and Sustainable Environment |
ENVIRONMENTAL IMPACT
ENVIRONMENTAL DETERMINATION: Consideration and possible recertification of Final Environmental Impact Report (FEIR) prepared (December 2022) (State Clearinghouse No. 2016042030).
BACKGROUND AND DISCUSSION
On or about December 18, 2014, Napa Valley Vineyard Engineering, Inc. on behalf of the Applicant submitted an application for the Le Colline Vineyard Erosion Control Plan for New Vineyard Development to the PBES Department requesting approval of an agricultural erosion control plan to install an approximately 32.8 gross acre (±25.0 net acre) vineyard on the Property (the Proposed Project).
The Proposed Project is located south of the community of Angwin, on the east side of Howell Mountain Road and west of Cold Springs Road, within the unincorporated portion of the County. Because the Proposed Project includes a timber harvest and conversion component within the development area, CDF initially was the Lead Agency for purposes of the CEQA analysis however on July 24, 2017, CDF confirmed that the County would be the Lead Agency. In September 2017, Lead Agency status for the Proposed Project was transferred to the County.
On January 3, 2019, the “Draft Environmental Impact Report (DEIR) for the Le Colline Vineyard Project (January 2019)(State Clearinghouse No. 2016042030)” was released for public and agency review. The initial public comment period ran from January 3, 2019 through February 19, 2019. On February 19, 2019 the public comment period was extended by the County to February 25, 2019. Between the start of the public comment period on January 3, 2013, and its end on February 25, 2019, the County received 100 public and agency written comments on the DEIR.
In accordance with CEQA, all comments received on the DEIR during the comment period were responded to and included in a Final Environmental Impact Report released on December 27, 2022 (FEIR). The FEIR included comments and responses to comments on the DEIR in Volume I and revisions to the DEIR in Volume II. In response to the comments received concerning reduced impacts to sensitive habitats including Conn Creek, the Increased Water Quality and Sensitive Habitat Protection Alternative (Water and Habitat Alternative) presented in the DEIR, was revised and included in the FEIR Vol. II (as revised, the Modified Project). The revised Water and Habitat Alternative (also known as the Modified Project) would result in the gross disturbance of 28.45 acres. The original Proposed Project would result in the gross disturbance of 33.8 acres. When comparing the Proposed Project with mitigation to the Water and Habitat Alternative with mitigation, the Modified Project results in a 5.35-acre reduction, which is due to it including an assured 200-foot buffer along Conn Creek and enlarging others throughout the Proposed Project and protecting key Oak Woodland habitats. Under the Water and Habitat Alternative, approximately 1.12 acres of Mixed Oak Alliance and 4.23 acres of Douglas-Fir Alliance were avoided through a reduction in vineyard totaling approximately 5.35 acres for a total gross project area of 28.45 aces. This is shown in greater detail in Figure 5-2 of the FEIR. The Water and Habitat Alternative further increases stream setbacks of vineyard blocks, which further avoid areas with relative higher biological value, provides for further water quality protections as well as for greater wildlife movement beyond the Proposed Project. Further detail of the adopted Water and Habitat Alternative can be found in Section 5.0 of the FEIR - Vol II.
On December 27, 2022, the FEIR was mailed to all commenting state and local agencies, organizations and individuals at least ten days prior to the County’s certification of the FEIR and consideration of the Proposed Project.
On March 13, 2023, notice was given to all property owners within 1,000 feet of the Proposed Project and posted on the County’s PBES Current Projects Explorer page at https://www.countyofnapa.org/2876/Current-Projects-Explorer of the Director’s tentative decision to: (1) certify the EIR prepared for the Le Colline ECPA (P14-00410-ECPA); (2) adopt the findings required pursuant to the CEQA including, but not limited to, rejecting the Proposed Project, the No Project Alternative and the Reduced Intensity Alternative, finding the Increased Water Quality and Sensitive Habitat Protection Alternative as revised and as set forth in the FEIR (the Modified Project) consistent with the Napa County General Plan; (3) adopt the Mitigation Monitoring and Reporting Program; and (4) approve ECP No. P14-00410-ECPA as revised to reflect the Modified Project, which generally consists of increased stream setbacks avoid areas with relative higher biological value, and provide for greater wildlife movement.
The Modified Project consists of 20.55 net acres of new vineyard.
On March 24, 2023, the Director’s Notice of Decision to approve the Modified Project was given to property owners within 1,000 feet of the Proposed Project and posted on the County’s Current Projects Explorer page at https://www.countyofnapa.org/2876/Current-Projects-Explorer.
On April 7, 2023, the Modified Project was timely appealed by Appellant Center for Biological Diversity primarily due to concerns about the adequacy of the environmental analysis related to special-status aquatic species and sensitive habitats, wildfire risk, greenhouse gas emissions, aesthetic and recreational impacts to Linda Falls Preserve, and erosion (the Appeal).
Code Compliance: There are no active code violations at the Project site.
Public Process:
The application for the Le Colline agricultural erosion control plan (P14-00410-ECPA) was submitted on December 18, 2014.
On April 13, 2016, a Notice of Preparation (NOP) of an Environmental Impact Report (EIR) and Initial Study were circulated and noticed by CDF. The NOP was circulated through the State Clearinghouse, to the public, local, State, and federal agencies, and other known interested parties for a 30-day review period that ended on May 13, 2016. A notice was published on April 13, 2016 in the Napa Valley Register. In accordance with CEQA Guidelines Section 15063, three (3) comments were received from the public and County on the NOP.
On January 3, 2019, in accordance with CEQA, the DEIR was released for a 45-day public and agency review and comment period. The initial public comment period ran from January 3, 2019 through February 19, 2019, and on February 19, 2019 was extended by the County to February 25, 2019. The County received 100 public and agency written comments on the DEIR.
On December 27, 2022, in accordance with CEQA, the FEIR was mailed to all commenting state and local agencies, organizations and individuals at least ten days prior to the County’s certification of the EIR and consideration of the Proposed Project.
On March 24, 2023, the Director’s Notice of Decision to approve the Modified Project and related action was given to property owners within 1,000 feet of the Project and posted on the County’s Current Projects Explorer page at https://www.countyofnapa.org/2876/Current-Projects-Explorer. The Modified Project consists of 20.55 acres of new vineyard on the Property.
The approval letter with the final adopted conditions of approval was forward to the Applicant on March 24, 2023.
On May 10, 2023, public notices of this appeal hearing were mailed, emailed and provided to all parties who received notice of the DEIR and within 1,000 feet of the Property. The notice ran in the newspaper on May 17, 2023.
The public comment period on this appeal will have run for 96 days by the time the hearing is held on August 15, 2023.
Findings:
When reviewing the project, the Director based its decision on a series of Findings, as required under both County Code and State law. The Board of Supervisors must also consider all of the same Findings in reaching its decision. To uphold the Director’s approval of the project and denial of the Appeal, the Board must determine that the project is consistent with each of the following Findings. Alternatively, to deny the project and grant the Appeal, the Board must determine that the project is not consistent with at least one (or more) of the Findings or the County General Plan.
CEQA:
1. The EIR reflects the independent judgment of the Board.
2. All individuals, groups, and agencies desiring to comment were given adequate opportunity to submit oral and written comments on the Draft EIR and to submit written comments on the adequacy of the Final EIR for certification. These opportunities for comment meet or exceed the requirements of CEQA, CEQA Guidelines, and the Napa County Local Procedures for Implementing the California Environmental Quality Act.
3. All comments submitted during the public review and comment period on the Draft EIR, and on the adequacy of the DEIR have been considered and responded to in the Final EIR or included in the public record.
4. No new comments or information has been submitted during the comment period that would change the analysis or conclusions of the Final EIR.
5. The Board has been presented with all of the information in the administrative record, testimony, and EIR documents including the Errata for the Final EIR and has reviewed and considered this information and the Final EIR prior to approving the project.
6. The Final EIR has been completed in compliance with the intent and requirements of CEQA, CEQA Guidelines, the Napa County Local Procedures for Implementing the California Environmental Quality Act and reflects the independent judgment of the County.
CONSERVATION REGULATIONS:
1. The application is complete, and the plans and reports submitted therewith adequately describe the proposed project.
2. The project is supported by adequate environmental documents that comply with the provisions of CEQA.
3. The project provides for specific changes or alterations which avoid or mitigate the significant environmental effects of the project as identified in the recommended FEIR.
4. The project, as approved, is consistent with the objectives, policies and general land uses and programs set forth in the general plan and the zoning of the site.
APPEAL:
On April 20, 2023, CBD timely filed an appeal packet to the Director’s decision to approve the Modified Project allowing 20.55 acres of new vineyard development. (Please see Attachment B). Pursuant to the County's appeals ordinance (Napa County Code Chapter 2.88) a public hearing on an appeal must be scheduled not less than twenty-five days nor more than ninety calendar days from submittal of an appeal. To accommodate all parties' schedules and the 90-day ordinance requirement, the Appeal hearing was opened on June 6, 2023, and continued with consent of all parties to August15, 2023.
Pre-Hearing Conference:
To clarify the County's procedural requirements and expectations regarding land use appeals, the Board of Supervisors requires the parties attend a mandatory pre-hearing conference with a representative of the County Counsel’s office and the Chair of the Board to discuss estimates on presentation lengths, scope of evidence, and testimony to be presented, together with witness lists. Any witness not appearing on a witness list is treated as a member of the public and allotted the usual three minutes of speaking time.
A pre-hearing conference was held on May 31, 2023, with Appellant, Applicant’s counsel, Chair Ramos and a Deputy County Counsel. At that time, Appellant and Applicant agreed to provide a list of their respective witnesses along with the subject matter of testimony and time estimates in advance of the hearing. The Chair informed the Appellant and the Applicant that each side is allocated a maximum of 30 minutes for their presentation, allocated at their discretion. A summary of the witness information by name, subject matter of testimony, and time estimates that was provided by Appellant and the Applicant is provided in Attachment C.
Appellant and Applicant also agreed to provide the Chair in advance of the hearing with any requests for “good cause” to either supplement the record with new information and/or requests to have the Appeal heard de novo (e.g., a fresh hearing). Neither Appellant nor Applicant submitted a “good cause” request to supplement the record on appeal before the Board or to have the Appeal heard de novo.
At the pre-hearing conference, Appellant further agreed to provide any supplemental information, not to exceed five pages, and Applicant agreed to a limit of ten pages for any additional information. The supplemental information provided by Appellant is attached as Attachment D and as Attachment E from Applicant. The information is also available for review online at: at https://www.countyofnapa.org/2876/Current-Projects-Explorer.
Appeal Hearing Public Comments:
Public notice of this appeal hearing was mailed and provided to all parties who received notice of the Director’s decision on March 24, 2023, to property owners within 1,000 feet of the Property and those who commented on the DEIR and/or FEIR. The notice ran in the Napa Valley Register on May 17, 2023. On June 6, 2023, the public hearing was opened and continued to August 15, 2023 to accommodate all parties’ schedules. No public testimony occurred on June 6, 2023.
The public comment period on this appeal will have run for 96 days by the time the hearing is held on August 15, 2023.
All correspondence received by the Clerk of the Board as of July 31, 2023, is included as part of the correspondence in Attachment F to this report. It is also available at: https://www.countyofnapa.org/2876/Current-Projects-Explorer.
Stated Basis for Appeal:
GROUNDS OF APPEAL
The following outlines the basis of the Appeal as contained in Appellant’s Appeal dated April 20, 2023. (See Attachment B). For convenience, staff has provided a summary below, but recommends the Board review the actual Appeal for details.
Appeal Ground No. 1: Appellant asserts that the EIR fails to adequately portray and analyze the Proposed Project's impacts to special-status species and sensitive habitats in and near the Project area. In particular, CBD claims that the EIR incorrectly concludes that suitable habitat for foothill yellow-legged frogs (FYLF), California red-legged frogs (CRLF) and California giant salamanders (CGS) does not occur within the project site and that the Project site is located "outside the known range of the coast range newt", contrary to publicly available data and information from experts.
Staff Response: Appellant’s assertions lack merit and disregard the substantial evidence in the record. Beginning in 2014 through 2017, expert biologists logged almost 100 hours of biological surveys on the project site for special-status species, including aquatic and amphibian species, and sensitive habitats. Based on those surveys, the EIR’s professional biologists reasonably and appropriately determined that suitable habitat for special-status amphibians and aquatic reptile species does not occur in the vineyard development areas. Conn Creek is outside of the vineyard development areas and is at least 105 feet from areas proposed for disturbance along the southern property line. Although Conn Creek could support special-status aquatic species such as FYLF, CGS, and western pond turtle, the EIR disclosed that steep slopes (approximately 30% or more) prevent access to the vineyard development areas by these special-status aquatic species from Conn Creek. Furthermore, the EIR disclosed that construction and timber harvest noise and disturbance could indirectly impact potentially occurring populations of special-status aquatic species.
Substantial evidence based on field surveys and expert biological opinions supported the findings in the DEIR. However, out of an abundance of caution and in response to public concerns and comments, the FEIR added Mitigation Measure 4.4-4 to enhance protection of special status aquatic and amphibian species by limiting work during significant rain events to allow potentially occurring special-status aquatic species to move away from aquatic breeding sites and requiring vegetation piles along Conn Creek to be allowed to naturally degrade.
When an agency conducting CEQA review is faced with conflicting evidence on an issue, it is permitted to give more weight to some of the evidence and to favor the opinions of some experts over others; mere disagreement among experts does not make an environmental impact report (EIR) inadequate. (Chico Advocates for a Responsible Economy v. City of Chico (2019) 40 Cal. App. 5th 839.) Here, the EIR reasonably articulated the reason suitable habitat for special-status aquatic species does not occur within the vineyard development areas. Despite the well-reasoned analysis, the FEIR addressed public comments and resolved the disagreement by assuming presence of habitat for the special status aquatic species and mitigating any potential harm.
Furthermore, in response to CBD’s assertions, County staff requested that environmental consulting firm Environmental Science Associates (ESA) peer review the EIR’s impact analysis of special-status amphibians and aquatic reptile species and independently determine if the findings, Mitigation Measure 4.4-4 and the conclusions that the Proposed Project would result in less than significant impacts on FYLF, CRLF, and CGS was supported by substantial evidence. The memorandum prepared by ESA’s Certified Wildlife Biologist Brian Pittman (Independent Biologist Pittman) reaffirmed the conclusions of the EIR that impacts on special-status aquatic species and amphibians were appropriately considered and mitigated, as follows (see Attachment G):
California red-legged frogs (CRLF): Members of the public commented on the DEIR that CRLF was potentially present in Conn Creek. However, the CRLF was not mentioned by the California Department of Fish and Wildlife (CDFW), the state agency with jurisdiction by law over fish and wildlife natural resources, in their comment letter on the DEIR as potentially present on the site or in Conn Creek. Also, according to the California Natural Diversity Database (CNDDB), the nearest extant CRLF populations are 15 miles to the southeast in Capell Valley and 14 miles to the southwest at Trione-Annadel State Park in Sonoma County. There are two historical records from the region, one approximately four (4) miles north of the Project area in a channel adjacent to Howell Mountain Road that was capped and an early 1900 record seven (7) miles west of the site in the vicinity of Calistoga. For these reasons, Independent Biologist Pittman confirmed that substantial evidence in the record supports the conclusions of the EIR that the project area lacks suitable habitat for CRLF. Despite the lack of suitable habitat and in response to comments on the DEIR, Mitigation Measure MM 4.4-4 was included in the FEIR to reduce impacts to potentially occurring special-status aquatic species in Conn Creek, including CRLF by avoiding working at the project site when special-status aquatic species may be present and by limiting the possibility of pollution of Conn Creek.
Foothill yellow-legged frogs (FYLF): The DEIR comment letter from CDFW (A1) describes the FYLF as a California candidate for state listing, which is technically correct for the statewide population; however, is in error for the north coast distinct population segment (DPS), which includes Napa County. The FYLF north coast DPS is not proposed for listing and is a California species of special concern.
Appendix D of the DEIR appropriately disclosed that suitable habitat for FYLF does not occur in areas proposed for vineyard development. FYLF occurs in shallow streams with some cobble, riffles, and sunny banks. The ephemeral drainages on the Property do not provide suitable habitat for this species. The nearest recorded occurrence was observed in 2015 near Conn Creek approximately 0.06 miles from the project site. Conn Creek is at least 105 feet from areas proposed for disturbance along the southern property line, and steep rocky slopes between the creek and the Property greatly limit the potential for FYLF to occur on the project site. According to Independent Biologist Pittman, substantial evidence in the record supports the DEIR’s conclusion that habitat for FYLF does not occur within the project site, and the DEIR appropriately did not recognize the potential for this species presence in Conn Creek, as the creek was off-site and the FYLF population had not been discovered or reported to the CNDDB when the Kjeldsen Biological Resource Report (DEIR Appendix D) was prepared in 2015.
The FEIR, which was released in December 2022, again acknowledged the presence of FYLF in Conn Creek some 0.06 miles from the project site and described the site conditions that would buffer FYLF populations from project impacts including steep slopes and the distance that separates the project site from Conn Creek. The FEIR also appropriately characterized potential impacts to FYLF, which are limited to noise and vibration effects from large equipment. Independent Biologist Pittman confirmed that the FEIR accurately described the potential presence of FYLF habitat in the project area (not the project site) and sufficiently characterized potential noise and disturbance impacts. As with CRLF, in response to comments, the FEIR included additional protection measures in Mitigation Measure 4.4-4 as requested by CDFW should FYLF be found on the project site. (Vol. II, pg. 4.4-20).
Although Independent Biologist Pittman reaffirmed that additional measures are not required to reduce amphibian impacts to less than significant level under CEQA, preconstruction surveys and worker education was recommended to provide even greater protection and further reduce the magnitude of this already less than significant impact should FYLF venture further than their documented range of 40 meters on to the project site. Staff has incorporated the recommendations for preconstruction surveys and worker training into the Errata to the FEIR (see Attachment I).
California giant salamanders (CGS): The CGS is a California species of special concern with recent (2016) records from Moore Creek, approximately one (1) mile east of the project site. They are not documented from Conn Creek, and neither the CDFW DEIR comment letter (A1) nor the site assessment by Alvarez (e.g., DEIR comment letter A1, exhibit 2) anticipated habitat for this species in the creek. While CGS breeding is strongly associated with cold, perennial streams, and adults and juvenile seek cover within nearby riparian corridors and adjoining habitats, the presence of suitable habitat had not been identified or suggested by professional herpetologists who have reviewed Conn Creek in the project vicinity.
Recognizing public concerns and comments relating to CGS, again the DEIR was revised to reflect the potential for CGS to occur in Conn Creek and the FEIR added Mitigation Measure 4.4-4 to reduce impacts to potentially occurring special-status aquatic species including CGS. As Independent Biologist Pittman’s recommendation for preconstruction surveys for CGS and worker training regarding CGS (though not legally required to reduce impacts) has been incorporated into the Errata to the FEIR (Attachment I).
Coastal range newt: Additionally, coastal range newt does not appear on the special-status species queries that were conducted for the project site (Appendix G of the Draft EIR), and the nearest record occurrence is located approximately 130 miles south of the project site (CDFW, 2019). Therefore, the project site is appropriately presumed outside the known range of coast range newt. Regardless, Mitigation Measure 4.4-4 was added to the FEIR to ensure that any potential impacts to special-status aquatic species including coastal newt range remain less than significant. The findings of the FEIR are consistent with the previous findings of the DEIR that special-status species would not be significantly impacted from implementation of the Proposed Project.
CEQA requires only that an EIR provide a reasonable and practical analysis of environmental impacts. (Rodeo Citizens Ass’n v. County of Contra Costa (2018) 22 CA5th 214, 226.) The EIR and FEIR reasonably and adequately analyzed the Proposed Project’s potential impacts. Contrary to Appellant’s assertions, substantial evidence in the record supports the conclusions reached that impacts to special status species and sensitive habitats would be less than significant. Furthermore, because the Modified Project would reduce the amount of acreage disturbed for vineyard development, the likelihood of special-status aquatic species being located in area of active work will be reduced, resulting in reduced impacts to special-status aquatic species. Lastly, Independent Biologist Pittman peer reviewed the biological analysis and reaffirmed the appropriateness and adequacy of the analysis and of revised Mitigation Measure 4.4-4. The additional recommendations of Independent Biologist Pittman for preconstruction surveys and worker training have been included in the Errata to the FEIR though not legally required to reduce impacts to a less than significant level.
Appeal Ground No. 2: Appellant asserts that the EIR fails to analyze wildfire impact or disclose the site's fire history, despite the fact that the Proposed Project is in a very high fire hazard severity zone. Appellant further asserts that the EIR should incorporate traditional ecological knowledge and indigenous science into its wildfire analysis, and the EIR includes unsubstantiated claims that the project will reduce wildfire risks, when in fact data from previous wildfires in Napa County shows that small, isolated vineyards do not reduce wildfire risk.
Staff Response: Appellant mischaracterizes the rationale regarding the Proposed Project’s reduced wildfire risk. It is not the vineyard in and of itself that reduces the wildfire risk but rather the removal of natural vegetation that is susceptible to fire and the resulting reduction in fuel loads that would reduce the risk or spread of fire.
CEQA requires an EIR to analyze “any significant environmental effects the project might cause or risk exacerbating by bringing development and people into the area affected. (CEQA Guidelines, Section 15126.2 (a).) CEQA does not require that an EIR incorporate traditional ecological knowledge and indigenous science into its wildfire analysis. Because of the low traffic volumes that would be generated by the Proposed Project, the removal of non-irrigated flammable vegetation and with implementation of the Proposed Project’s Emergency Action Plan, substantial evidence in the record supports the conclusion that the Proposed Project would not increase wildfire risk or substantially impair evacuation routes.
The purpose of the project is to develop approximately 20.55 acres of new vineyard. As part of that development, approximately 26.97 acres of forest, oak woodland and shrubland would be removed to accommodate the vineyard and related infrastructure. While the primary intent of the project is not necessarily to reduce existing fuel loads, it will in fact do just that by virtue of the removal of natural vegetation to accommodate the vineyard and related infrastructure. The FEIR notes that the “[m]uch of the forested areas of Angwin contain flammable dead and dying understory and/or large stands of pyrophytic species that increase ignitability of the forest canopy.” (FEIR Vol.1, pg. 4-3.) As stated in the FEIR, the Proposed Project would reduce overall fire susceptibility onsite through the reduction and separation of biomass fuels in the existing forest canopy and understory, resulting from a less fire-sensitive irrigated agricultural crop. That reduction in the continuity of wildland fire biomass fuel would the reduce the risk or spread of fire.
The FEIR described fire history in the area, and also disclosed that because the Property abuts residential neighborhoods and is bordered by Conn Creek, it is essentially an island of undeveloped potential fire fuel (FEIR Vol. 1 pgs. 4-2 and 4-3). The development of new agricultural roads and avenues in proximity to the proposed vineyard blocks would improve access to wildland areas which in turn would likely improve fire response and would not increase wildfire risk or impair evacuation routes.
Furthermore, Condition of Approval No. 8 (Attachment J), requires the Applicant to submit to the Director of PBES for review and approval a Fire Risk Reduction and Emergency Action Plan (the Emergency Action Plan or Plan), which is intended to minimize fire risk during both construction and operation of the vineyard. The Plan must include the following elements:
• Equipment, fuels, and chemicals would be stored in appropriate containment facilities and areas that would be appropriate for reducing the risk of fire ignition.
• Equipment would be allowed to cool during a break before refueling.
• No equipment would be operated that would have the potential to create a spark when the National Weather Service issues a Red Flag Warning.
• All equipment would be equipped with fire extinguishers and or shovels, and any future equipment would be equipped, with fire extinguishers and or shovels. Equipment operators would be trained by a qualified professional during onboarding and annually in the use of best fire prevention practices as well as in the use of fire equipment.
• Brush would be burned in accordance with the standards of the California Department of Forestry and Fire Protection, and only on approved burn days with appropriate permits and/or authorization from the Bay Area Air Quality Management District.
• In accordance with standard practice, any blasting would occur only after vegetation has been cleared from the site, reducing the fuel load in the area.
• A fire safety plan would be provided to Napa County for approval and the approved plan would be supervised by a licensed third-party vendor during blasting.
• All employees would be trained on the Emergency Action Plan to address site-specific environment and evacuation nuances for fire, emergency, etc. The EAP includes preventive measures such as establishing and maintaining firebreaks and establishing safe work zones as necessary; safety measures that would be implemented during an incident including an evacuation plan, communication procedures, and isolation and securing of power and other ignition sources; and reporting and communication protocols with management and emergency officials.
The Emergency Action Plan would impose fire reduction measures that would reduce the risk of fire or the spread of fire by prohibiting certain equipment from being used on Red Flag warning days, requiring maintenance of firebreaks, establishing communication protocols, educating employees and operators on fire preventative practices and addressing site-specific hazards.
Furthermore, the small number of additional trips that would be generated by the Proposed Project would not substantially impair emergency access or evacuation. As disclosed in the EIR, there would be approximately 22 new daily trips associated with construction and operation of the project. The peak daily volume on Cold Springs Road is conservatively estimated at 259 trips, and even with the additional 22 new project trips (the equivalent of two single-family residences) traffic volumes would still be well below the County’s maximum capacity of 1,000 vehicles per day on Cold Springs Road. Because of the low traffic volumes that would be generated by the Proposed Project along with removal of approximately 27 acres of natural vegetation and implementation of an Emergency Action Plan, substantial evidence in the record supports the conclusion that the Proposed Project would not increase wildfire risk or substantially impair evacuation routes.
Appeal Ground No. 3: Appellant asserts that the EIR underestimates the GHG impacts of the Project because it ignores the loss of carbon sequestration from the loss of shrublands. This undercounting of the Proposed Project’s GHG emissions is a significant information gap in the EIR and undermines the FEIR’s conclusions in its GHG emissions significance analysis.
Staff Response: In response to CBD’s assertions related to the adequacy of the GHG analysis, the County retained the services of Environmental Science Associates (ESA) to independently peer review the GHG analysis (Attachment H - ESA Jyothi Iyer, Air Quality Specialist, Peer Review GHG Memorandum, August 1, 2023). The independent analysis provides a more complete evaluation of GHG related impacts relative to the FEIR, including updates to the estimation of project construction and operational emissions using more current models, emission factors and equipment activity level anticipated for the Proposed Project. The analysis also updates carbon storage and carbon sequestration of the existing land use types (including loss of carbon sequestration from shrublands) that would be lost as a result of land conversion that would occur as part of the Proposed Project, as well as the carbon storage and sequestration that would be gained as a result of converting existing land uses into vineyards and other conservation measures included in the Proposed Project.
Accounting for the various gains and losses, Table 6 of the GHG Peer Review Memorandum shows that the net change in annual ongoing GHG emissions would continue to be below the BAAQMD’s 1,100 (MT CO2e per year) operational threshold for GHG at the time of publication of the EIR, and therefore considered to be a less than significant impact as was disclosed in the DEIR.
In addition, the Applicant has voluntarily committed to further reduce GHG impacts to achieve net-zero operational emissions. To that end, the Applicant proposes planting of 650 new conifers to increase carbon sequestration to help reach the net-zero target. Additional tree planting would occur to achieve 650 surviving mature trees according to a tree planting mitigation and monitoring plan, subject to review and approved by Napa County. It is assumed that approximately 75 trees per acre would generate a carbon sequestration rate of 3.129 MT C per acre per year reported in the Napa County CAP. Tree planting would be limited to areas that are considered developable; therefore, depending on availability of land for planting, the Applicant may consider other County-approved measures in addition to tree planting to offset the project’s operational emissions and achieve the net-zero target. As shown in Table 6, after accounting for the voluntary tree planting measure, which Applicant’s commitment is enforceable per Condition of Approval No. 11, the project would result in no net increase in operational emissions. Failure to achieve no net increase in operational emissions could result in a reduction to the Proposed Project to levels that would achieve no net increase.
Appeal Ground No. 4: Appellant claims that the EIR fails to use the best available science to estimate emissions, for example, by using an outdated version of CalEEMod. (Compare CalEEMod "User Guide" (2022) p. 47 with CalEEMod "User Guide (2013) p. 38).) The incomplete accounting of GHG emissions means that the significance analysis is inaccurate. Further, it raises doubts about the adequacy of the Project's GHG mitigation measures. The Final EIR states that the harvesting of lumber and permanent protection of oak woodlands would reduce the Proposed Project's construction emissions to less than significant. (FEIR 4.7-9) However, according to Appellant, these mitigation measures may not be adequate if the actual Project emissions are higher when the loss of carbon sequestration from removal of shrublands is included.
Staff Response: The GHG emissions presented in the DEIR were estimated using CalEEMod2013 using construction schedule, phasing and equipment data available at that time. In response to CBD’s claims, the estimates of GHG emissions from project construction activities were updated using CalEEMod2016, the most recent version of CalEEMod at the time of publication of the DEIR (2019) (Attachment H - ESA Jyothi Iyer, Air Quality Specialist, Peer Review GHG Memorandum, August 1, 2023). Though a more recent version of CalEEMod was released after publication of the DEIR (version 2022), the Project’s modeling has been updated to correspond with the version that would have been available at the time of DEIR publication. In addition to using the 2016 version of CalEEMod, inputs into CalEEMod such as construction schedule and phasing, construction equipment and vehicles used for each phase were also updated. These updates are consistent with project construction methods currently anticipated by the Applicant for project construction and operation. The updated construction schedule and phasing is shown in Table 1 of the Memorandum with additional details presented in Tables 2 and 3. For background information, the corresponding data used in the DEIR analysis is provided in Attachment 1 of the Memorandum.
The updated GHG emissions also took into consideration the full extent of avoided deforestation within developable areas, specifically the preservation of 4.12 acres of developable oak woodlands and 5.27 acres of developable Douglas Fir. As summarized in Table 4 of the Memorandum, the updated GHG analysis continues to show the Modified Project would not exceed the construction threshold of 1,100 MT CO2e per year. As such impacts to construction related GHGs continues to be less than significant as was disclosed in the DEIR.
Appeal Ground No. 5: Appellant contends that EIR's alternative analysis is inadequate and that the EIR concludes that the Reduced Intensity Alternative is economically infeasible without the concrete facts that CEQA requires and does not provide adequate support for the conclusion that the Reduced Intensity Alternative is less environmentally protective. Further, Appellant asserts that the EIR claims that the alternatives are not necessary because the Project would have less than significant impacts, which is contrary to established CEQA caselaw.
Staff Response: An EIR does not need to consider every possible alternative but must consider alternatives that would foster informed decision-making and public participation. The scope of alternatives reviewed must be considered in light of the nature of the project, the project’s impacts, relevant agency policies, and other material facts. (Mira Mar Mobile Community v. City of Oceanside (2004) 119 Cal.App.4th 477, 487.)
In this instance all potentially significant impacts of the Proposed Project have been addressed via mitigation measures, so the Alternatives do not need to avoid or substantially lessen any significant environmental impacts. In other words, there are no significant unavoidable impacts resulting from the Proposed Project. Three Alternatives were evaluated in the EIR to further reduce impacts beyond those already necessary to address significant environmental impacts. The EIR contains approximately 12 pages devoted to the Alternatives analysis including, but not limited to, a full and adequate discussion of the No Project Alternative, the Reduced Intensity Alternative and the Water and Habitat Alternative along with the comparative merits of each of the Alternatives in text and table format, the ability of each Alternative to attain the Project objectives and the approximate vineyard blacks and acreage of each Alternative as compared to the Proposed Project. The Alternatives analysis provided sufficient information about each alternative to allow evaluation, analysis and comparison to the proposed project and therefore meets the requirements of CEQA.
Because the focus of an EIR is on environmental impacts, the evidence of economic infeasibility does not need to be presented in the EIR itself but can be in the supporting administrative record. (Flanders Found. v. City of Carmel-by-the-Sea (2012) 202 CA4th 603, 618.) Here, although not required, the EIR did include evidence of economic infeasibility. Among the comments on the DEIR, is a letter from Applicant’s counsel and an Economic Viability Analysis from the Applicant (DEIR, Comment Letter #88) showing that because of startup, overhead and ongoing maintenance costs, the development of 15 net acres of vineyard would not be profitable and would generate at an approximately $82,000 loss each year during the expected 25-year lifetime of the vineyard.
Ultimately, “the question is ... whether the marginal costs of the alternative as compared to the cost of the proposed project are so great that a reasonably prudent [person] would not proceed with the [altered project].” (Uphold Our Heritage v. Town of Woodside (2007) 147 Cal. App.4th 587, 600.)(“Woodside”). The Woodside case does not require any particular economic analysis or any particular kind of economic data but requires generally “some context” that allows for economic comparison. The court declined to limit the ways in which economic infeasibility could be shown, noting they could be numerous and vary depending on the circumstances. [“It is not necessary to identify every conceivable means of establishing the lack of feasibility..”].) (Woodside at 600-601.) Contrary to Appellant’s assertion, the record includes evidence of economic infeasibility from which it can be determined that a reasonable prudent property owner would not proceed with a vineyard project consisting of 15 net acres or less.
Appeal Ground No. 6: Appellant asserts that the EIR does not properly analyze or mitigate the Proposed Project's significant aesthetic or recreational impacts to Linda Falls Preserve, a beautiful and beloved local attraction. The aesthetic and recreational value of the area is high, and the Proposed Project will impair the views from the Preserve and recreational opportunities around Conn Creek without appropriate mitigation.
Staff Response: CBD’s claims that the Proposed Project will “impair the views from the [Land Trust property] and recreational opportunities around Conn Creek without appropriate mitigation” is unsupported. Notably and significantly, neither the Napa County Land Trust (the property owner of Linda Falls) nor the Napa County Parks and Open Space District (the entity that owns the trail easements) commented that the Proposed Project would impair or negatively impact the recreational or aesthetic values of Linda Falls Preserve.
The Proposed Project includes an average of 335-foot setbacks from Conn Creek and much further from the Linda Falls Trail located primarily on the adjacent Land Trust property. In addition, the vineyards are higher in elevation than Linda Falls Trail and Conn Creek which when considered in conjunction with the distance and dense forest cover supports the fact that the vineyards cannot be seen from the Linda Falls Trail. Also, there are two existing vineyards that are larger and closer in proximity than the Proposed Project vineyards that have not generated any issues to date in comments on the DEIR. Appellant’s speculation and fear does not rise to the level of substantial evidence. Substantial evidence in the record supports the EIR’s finding that the Proposed Project will not impact Linda Falls or its visitors.
Appeal Ground No. 7: Appellant contends that the EIR fails to properly analyze existing erosion and runoff conditions at site and cannot support conclusion that project would result in 62% decrease in sediment (from CBD comment A6-07). Appellant further claims the EIR contradicts this reduction by acknowledging “that forested groundcover is relatively good and that vineyard cover crops are not sufficient to provide cover comparable to existing forest ground cover (DEIR Appendix J, pg. 2)(CBD comment A6-08). According to Appellant, the erosion benefits only apply in areas covered by chapparal.
Staff Response: The Proposed Project has been designed and engineered in a manner that would result in no net increase in runoff and erosion, as required by the County’s Conservation Regulations (Napa County Code Chapter 18.108) and applicable General Plan Goals and Policies. A hydrologic analysis was prepared by Matt O’Conner of O’Conner Environmental, Inc. (DEIR Appendix J), which provided a technical review of hydrologic and soil erosion conditions and process for both pre and post project conditions. The results of the analysis are contained in Table 4.6-2 of the Final EIR, which clearly shows a reduction in sedimentation for all proposed vineyard blocks and an overall 62% reduction for the Proposed Project.
Modification to vegetation cover associated with vineyard development and drainage do occur under project conditions, however, proposed drainage modifications are intended primarily to mitigate increases in runoff and/or erosion that could potentially occur due to changes in vegetation cover. In areas currently occupied by chaparral, ground cover is relatively poor. Under Proposed Project conditions, vineyard cover crops would significantly improve ground cover and reduce erosion rates. CBD correctly states that in areas currently occupied by forest, ground cover is relatively good, and vineyard cover crops are not sufficient to provide cover comparable to existing forest groundcover. However, in these areas, potential increases in erosion rates caused by a small decline in ground cover are mitigation by installation of cross-slope ditches in vineyard fields that shorten flow paths to prevent the development of concentrated flow that could cause rill erosion. In addition, four segments of grassy drainageway are proposed in Vineyard Blocks D and E to further reduce potential erosion in areas where concentrated flow could occur.
Appeal Ground No. 8: Appellant asserts that the 2:1 mitigation ratio does not mitigate for Proposed Project’s impacts to biological resources and GHG impacts. Appellant further questions whether preservation areas are otherwise developable (less than 30% and outside of stream/wetland setbacks) and claims Appendix D Figure 1 of the FEIR does not show the slopes outside of the proposed vineyard blocks.
Staff Response: CBD’s claims that the Proposed Project does not mitigate for impacts to biological resources and GHG impacts is unsupported. The Project as mitigated and approved under the Water and Habitat Alternative (Modified Project) results in the preservation and protection of over 70% of the existing tree canopy, permanently preserving 13.5 acres of oak woodland and 26.93 acres of Douglas Fir (26.35 acres) and Ponderosa Pine (0.58 acres) Alliances. The project complies with applicable General Plan policies, specifically Policy CON-24, which provides for adequate protection of oak woodlands as well as comports with the California Oak Woodlands Preservation Act.
CBD further questions whether the preservation areas are developable. The areas designated as commercial timberland (i.e. Douglas Fir and Ponderosa Pine Alliances) are under the jurisdiction of CDF and are subject to the Z’berg-Nejedly Forest Practice Act, which allows for timber harvesting and related activities, as regulated by the Forest Practice Rules. As such, timber harvesting within these areas could occur in the future. However, as a result of the Proposed Project, these areas will be permanently protected for future development including commercial timber harvesting (other than for fuel reduction and management purposes).
As discussed in Response to Appeal Grounds 3 and 4, the updated GHG analysis took into consideration the developability of avoidance and preservation areas. Please refer to those Responses for further details.
Appeal Ground No. 9: Appellant asserts that the EIR fails to mitigate for 9.29 acres of mixed manzanita (interior live oak - CA bay-chamise) and should be mitigated on a 2:1 ratio.
Staff Response: An Errata to the Final EIR has been prepared to provide clarifications related to the analysis of impacts to biological resources (Attachment I). In terms of the Mixed Manzanita (Interior Live Oak - California Bay - Chamise) Alliance, the DEIR and Final EIR broadly identifies all chaparral habitats on the Property as principally within the Chamise Alliance, which totals 20.62 acres. The Project was approved to remove approximately 9.29 acres of this Alliance. However, it is likely that large portions of the 9.29-acre chaparral area may support non-manzanita scrub habitat (e.g., pure Chamise Alliance or similar), which are not protected; however, all 9.29-acres are assumed to be sensitive and protected on a 2:1 basis unless detailed mapping is provided to identify the distribution of chamise-manzanita in a more detailed manner. If the extent of the chamise-manzanita areas are reduced as a result of detailed mapping, then the size of the preservation and enhancement areas could be correspondingly reduced. Ultimately, as detailed in the Errata, the project as mitigated will either result in the reduction of approximately 2.4 acres of the Chamise Alliance, or through more detailed mapping show a reduction in the extent of the protected chamise-manzanita areas. The Proposed Project would therefore be consistent with General Plan Policy CON-17, which requires a minimum 2:1 mitigation ratio of the chamise-manzanita areas.
Board Considerations and Staff Recommendation:
The following options are provided for the Board’s consideration regarding possible action on the Appeal:
• Deny the appeal in its entirety and uphold the Director’s approval of the Le Colline project to allow 20.55 acres of new vineyard development;
• Modify the scope of the Le Colline project with or without granting or denying the Appeal to reduce vineyard acreage, increase setbacks and/or the recommended Conditions of Approval. The approved project represents a decrease in intensification from the original proposal. All potential environmental impacts are less than the original proposal, which was found to be less than significant through a combination of project design, mitigation measures, and conditions of approval. However, this option provides the Board, at their discretion, the ability to further reduce potential impacts to biological resources, greenhouse gases, or other resource areas. If the Board elects to pursue this option, depending on the extent of the revisions, additional staff time may be necessary to consider the revisions have been analyzed;
• Uphold one or more grounds of the Appeal and reverse the Director’s decision, thereby denying the Le Colline vineyard project; or
• Remand the matter to the Director with direction.
In Staff’s opinion, none of the information provided in the appeal and/or other public comments received to date substantively challenges or requires modification of the decision reached by the Director regarding this matter. As a result, Staff recommends that the Board deny the appeal in its entirety and uphold the Director’s approval of the Project subject to the recommended Conditions of Approval.