TO: Board of Supervisors
FROM: Steven Lederer, Director of Public Works
REPORT BY: Liang Chin Su, Assistant Engineer
SUBJECT: Award of Construction Contract for “East Central Paving Project, Phase Three”, RDS 21-25C and Budget Transfer

RECOMMENDATION
title
Director of Public Works requests the following actions for the “East Central Paving Project, Phase Three”, RDS 21-25C:
1. Award of the construction contract for the “East Central Paving Project, Phase Three”, RDS 21-25C to Martin Brothers Construction of Sacramento, California for their low base bid of $1,150,920 as well as Additive Alternates Number 1 ($150,745.80), Number 2 ($2,862) and Number 3 ($1,200) for a total of $1,305,728 and authorization for the Chair to sign the construction contract; and
2. Approval of a Budget Transfer for the following (4/5 vote required):
a. Reclass appropriations of $483,229 in the Calistoga Area Paving Project (Fund 2040, Org 2040500, Project 22011) from Object 52360 (Construction Services) to Object 56100 (Transfers Out) to return some project funds to the Accumulated Capital Outlay (ACO) (Fund 3000, Org 3000000);
b. Increase Transfer Out appropriation by $906,587 in the ACO (Fund 3000, Org 3000000, Object 56100) with offsetting increase of $483,229 from Project 22011 to transfer to East Central Paving Project (Fund 2040, Org 2040500, Project 21067) and $423,358 use of available fund balance; and
c. Increase Construction Services appropriation by $906,587 in Project 21067 (Fund 2040, Org 2040500, Object 52360) offset by a transfer-in revenue from ACO.
body
EXECUTIVE SUMMARY
Staff recommends the Board award the construction contract to Martin Brothers Construction for their low base bid of $1,150,920 with Additive Alternates #1 (additional striping), #2 (additional asphalt dikes), and #3 (additional reflective delineators) for a total of $1,305,728, approve the budget transfers, and authorize the Chair to sign the construction contract.
FISCAL & STRATEGIC PLAN IMPACT
|
Is there a Fiscal Impact? |
Yes |
|
Is it currently budgeted? |
No |
|
Where is it budgeted? |
It is budgeted in Fund 2040, Org 2040500, Project 21067 but additional funding is needed. Funding will be provided by PG&E Fire settlement funds, and from the ACO (a portion of the $20M the Board previously identified for road repairs). |
|
Is it Mandatory or Discretionary? |
Discretionary |
|
Discretionary Justification: |
Using a portion of the PG&E settlement funds to repair public road as a result of damage from the 2017 North Bay Fires. |
|
Is the general fund affected? |
Yes |
|
Future fiscal impact: |
The work will be completed in summer of 2023. General road maintenance will be completed through road maintenance funds. |
|
Consequences if not approved: |
The project will not move forward to the construction phase and the damaged road will not be repaired. |
|
County Strategic Plan pillar addressed: |
Healthy, Safe, and Welcoming Place to Live, Work, and Visit |
ENVIRONMENTAL IMPACT
ENVIRONMENTAL DETERMINATION: Categorical Exemption Class 1: It has been determined that this type of project does not have a significant effect on the environment and is exempt from the California Environmental Quality Act. [See Class 1 (“Existing Facilities”) which may be found in the guidelines for the implementation of the California Environmental Quality Act at 14 CCR §15301; see also Napa County’s Local Procedures for Implementing the California Environmental Quality Act, Appendix B.]
BACKGROUND AND DISCUSSION
Napa County has settled with PG&E and recovered $33,954,044 to compensate the County for roadway damages, response costs and lost revenue funds that resulted from the 2017 North Bay fires. On July 28, 2020, the Board of Supervisors (Board) allocated $16,000,000 of this settlement to repair roadway damages. On May 4, 2021, the Board authorized an increase in the revenue and expenditures of $5,250,000 for a project to repair the following damaged roads:
• Atlas Peak Road (2400 feet North of Hardman Avenue to Westgate Drive)
• Hillcrest Avenue (All)
• Westgate Avenue (All)
• Soda Canyon Road (Silverado Trail to Loma Vista Drive)
• Second Avenue (All - northbound lane)
• Maui Way (All)
• Pinnacle Peak (All)
After the completion of East Central Paving Project Phase One, approximately $1,600,000 remained from the appropriated amount. The remaining funds from Phase One and an additional transfer of $1,607,264 was used to repair the following roads as part of the East Central Paving Project, Phase Two which was completed in October 2022:
• Second Avenue (All - southbound lane)
• Vichy Avenue (All)
• Mt. George Avenue (All)
• Olive Hill Lane (All)
The final phase of this project repairs the last 2.7 miles of Atlas Peak Road from 3681 Atlas Peak Road (Circle R Ranch) to the cul-de-sac, utilizing the remainder of the PG&E settlement funds from the first two phases of the East Central Paving (approximately $730,000) and the Calistoga Area Paving Project. In addition, The East Central Paving Project, Phase Three will also be transferring $423,358 from the ACO for maintenance and repair on Atlas Peak Road as well as funding the additive alternates to address safety concerns on the road. On May 16, 2023, the Board of Supervisors approved the East Central Paving Project, Phase Three Plans and Specifications and authorized to advertise for sealed bids and opening of the bids pursuant to Section 20150.8 of the Public Contract Code. Bids were opened on June 15, 2023. The lowest responsive base bid of $1,150,920 is from Martin Brothers Construction, from Sacramento, CA. Staff also recommends awarding Bid Alternates #1 (5.6 miles of thermoplastic striping for $150,745.80), #2 (additional asphalt dikes for $2,862), and #3 (additional reflective delineators $1,200) for a total of $1,305,728. The total project cost, including construction, bid alternates, construction management and contingency, is $1,636,587.
Martin Brothers Construction is not a local vendor; however, the Public Contract Code requires that the Board award the construction contract to the lowest responsible and responsive bidder regardless of whether the low bidder is local or not. Staff reached out to the local construction contractor community by advertising the request for bids in the Napa Valley Register and the Solano-Napa Builder's Exchange, and by posting on the County website.