TO: Board of Supervisors
FROM: Brian D. Bordona, Director of Planning, Building and Environmental Services
REPORT BY: Donald Barrella, Planner III
SUBJECT: KJS Investment Properties and Sorrento Inc. Appeal

RECOMMENDATION
title
PUBLIC HEARING - Hyperion Vineyard Holdings (A.K.A. KJS Investment Properties and Sorrento Inc.) Appeal No. P23-00350-APL
Move to continue the public hearing for an appeal filed by Center for Biological Diversity (Appellant) of the KJS Investment Properties and Sorrento Inc. (Applicant) Agricultural Erosion Control Plan No. P17-00432-ECPA approved by the Director of the Napa County Planning, Building and Environmental Services (PBES) Department on November 3, 2023. (No Fiscal Impact)
(PUBLIC HEARING OPENED AND CONTINUED FROM FEBRUARY 27, 2024. APPELLANT, APPLICANT, AND STAFF REQUEST A CONTINUANCE TO JUNE 25, 2024 AT 2:00 PM.)
body
BACKGROUND
The matter before the Board involves an appeal filed by Appellant of the KJS Investment Properties and Sorrento Inc. (Applicant) Agricultural Erosion Control Plan (ECPA) No. P17-00432-ECPA and the approval decision made by the Director of the PBES Department on November 3, 2023, to: (1) certify the Final EIR prepared for the KJS Investment Properties and Sorrento Inc. ECPA (No. P17-00432-ECPA); (2) adopt the findings required pursuant to the California Environmental Quality Act including, but not limited to, rejecting the Proposed Project, the No Project Alternative, and the Reduced Intensity and Increased Stream and Wetland Setback Alternative, finding the Reduced Vegetation Removal/Grading and Road Use Alternative (the Modified Project) as set forth in the Final Environmental Impact Report (FEIR) consistent with the Napa County General Plan; (3) adopt the Mitigation Monitoring and Reporting Program; (4) adopt the Modified Project Alternative and (5) approve ECPA No. P17-00432-ECPA as revised to reflect the Modified Project.
The Modified Project consists of a reduced overall footprint (form 156.8 gross acers to 113.4 gross acres) and associated road use and maintenance that reduces vegetation and woodland removal including, avoiding sensitive biotic communities and habitats of limited distribution (purple needlegrass grassland and blue wildrye grassland), increased avoidance of special-status plant and animal species and their habitats (including mapped oak trees greater than 30 inches in diameter at breast height, and areas generally containing higher biological diversity), provides for greater wildlife movement, and decreases surface water demand of the project.
The project site is located at 3380 and 3370 Sage Canyon Road, an approximate 950.9-acre holding situated in the Elder Valley Creek Drainage within the larger Lake Hennessey Sensitive Domestic Water Supply Drainage, approximately 10 miles east of the City of St. Helena, on the north side of Sage Canyon Road approximately 1.25 miles east of its intersection with Lower Chiles Valley Road (APNs 025-270-022 and 025-270-025).
On November 17, 2023, a timely Notice of Intent to Appeal was filed by the Appellant, and on December 5, 2023, the Appellant submitted a timely Appeal Packet.
Pursuant to the County's appeals ordinance (Napa County Code Chapter 2.88), a public hearing on the appeal was opened on February 27, 2024 and continued to May 7, 2024 at 2:00 PM as requested by the Appellant, Applicant and Staff.
On March 4, 2024, a request for continuance was received from the Appellant so that settlement discussions with the Applicant could be further pursed (Attachment A). Because the public hearing was previously opened, Staff requests that the Chair now request a motion for continuance to June 25, 2024 at 2:00 PM. Applicant, Appellant and Staff all support the continuance request.
Staff, Appellant and Applicant presentations and public testimony did not occur at the February 27, 2024 hearing and will not occur at the May 7, 2024 hearing. Presentations and public testimony may occur at the June 25, 2024 hearing.
Documents associated with No. P17-00432-ECPA and Appeal Record No. P23-00350-APL are available for review in the Napa County Department of Planning, Building and Environmental Services, and at https://www.pbes.cloud/index.php/s/dr4xHyB6RpioHyK
Requested Actions:
1. Chair introduces the item;
2. Motion by a Board member, second by another Board member, and a vote by the Board to continue the hearing to June 25, 2024, at 2:00 PM.
FISCAL & STRATEGIC PLAN IMPACT
|
Is there a Fiscal Impact? |
No |
|
Is it currently budgeted? |
No |
|
Where is it budgeted? |
All County staff costs associated with this Appeal will be fully reimbursed by the Applicant on a time and materials basis as set forth in County Fee Policy 80.037 (c). |
|
Is it Mandatory or Discretionary? |
Mandatory |
|
Is the general fund affected? |
No |
|
Future fiscal impact: |
No |
ENVIRONMENTAL IMPACT
ENVIRONMENTAL DETERMINATION: Draft Environmental Impact Report (State Clearinghouse No. 2018092042) prepared (April 2021); Final Environmental Impact Report (FEIR) prepared (March 2023) and circulated March 17, 2023, and certified on November 3, 2023.