Napa County Logo
File #: 24-315    Version: 1
Type: Agreement Status: Agenda Ready
File created: 2/15/2024 In control: Board of Supervisors
On agenda: 2/27/2024 Final action:
Title: Approve and authorize Agreement No. 240285B with G.H.D. INC. for a maximum of $467,493 for design and construction administration services needed to support the "North County Crossroads Paving Project," RDS 24-08. (Fiscal Impact: $467,493; Roads Fund; Budgeted; Discretionary) [4/5 vote required]
Sponsors: Board of Supervisors
Attachments: 1. Agreement
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

TO:                     Board of Supervisors

FROM:                     Steve Lederer - Director of Public Works

REPORT BY:                     Daniel Basore - Engineering Supervisor

SUBJECT:                     Approval of a Professional Service Agreement with G.H.D. INC

RECOMMENDATION

title

Approve and authorize Agreement No. 240285B with G.H.D. INC. for a maximum of $467,493 for design and construction administration services needed to support the “North County Crossroads Paving Project,” RDS 24-08. (Fiscal Impact: $467,493; Roads Fund; Budgeted; Discretionary)
[4/5 vote required]

body

BACKGROUND

On February 6th, 2024 the Board of Supervisors approved and authorized creation and design funding of Project 24021 for the "North County Crossroads Paving Project," RDS 24-08. Through a Request for Qualifications based process G.H.D. was selected as the most qualified team for engineering and other services relevant to completing state and locally funded road related projects.

The roads to be included in the project are as follows:

Bale Lane (0.70 miles)

Bennet Lane (2.2 miles)

Dunaweal Lane (0.81 miles)

Larkmead Lane (1.29 miles)

Lodi Lane (0.53 miles)

Old Lawley Toll Road (1.1 miles)

Silverado Trail, Larkmead Lane to Deer Park Road - Digouts/Crack Seal only (4.14 miles)

Tubbs Lane (1.1 miles)

 

Total Miles: 11.9 Miles

Construction is planned for Spring and Summer of 2024.

Requested Action:

1.                     Approval of and authorization for the chair to sign Professional Services Agreement No. 240285B with G.H.D. INC. for $467,493 for design and construction administration services.

 

FISCAL & STRATEGIC PLAN IMPACT

Is there a Fiscal Impact?

Yes

Is it currently budgeted?

Yes

Where is it budgeted?

Project 24021

Is it Mandatory or Discretionary?

Discretionary

Discretionary Justification:

The proposed Professional Service Agreement will provide design and construction administration services needed to support the North County Crossroad paving project.

Is the general fund affected?

No

Future fiscal impact:

Staff will return at a later date to request another budget amendment to fully fund the project, construction will be funded through the M-T SRF.

Consequences if not approved:

The roads will not be repaired and maintained, resulting in further deterioration and a potential roadway safety hazard. 

 

ENVIRONMENTAL IMPACT

ENVIRONMENTAL DETERMINATION: ENVIRONMENTAL DETERMINATION: The proposed action is not a project as defined by 14 California Code of Regulations 15378 (State CEQA Guidelines) and therefore CEQA is not applicable.